CDW was a subconsultant to assist with the study of the structural repairs necessary for the UMB Upper and Lower levels of the Plaza parking garage. CDW performed comprehensive testing of building materials for hazardous substances and prepared specifications for the handling of hazardous materials during construction. Our team examined and evaluated options for repairing or replacing the above-ground equipment used to ventilate the concrete slab floor of the lower level structure as well as the vapor barrier membrane installed beneath the slab of the lower level. CDW was also involved in the design of the acid waste treatment units, which have been installed and are operational.