MUNICIPAL INFRASTRUCTURE
City Of Framingham Master Plan
Framingham, MA
CDW was retained by Geosyntec Consultants for the field location and data collection of approximately 1,600 drainage structures throughout the City of Framingham. Using a hand-held GPS unit, each structure was measured for pipe inverts, depth of sump and overall condition.
A variety of structures including catch basins, drain manholes, headwalls, culverts, outfalls and paved swales were evaluated. The results were then mapped on the City’s GIS base maps to be used for future drainage studies.